    摘要:

    为解决木寨岭隧道的高应力软岩大变形的施工难题,对现场三台阶法施工进行了数值模拟。分析了开挖 后的围岩变形特征及围岩应力状态。研究结果表明:围岩变形以预收敛变形为主,掌子面变形较大。施工过程中, 加大围岩超前支护,控制掌子面变形和围岩预收敛变形的发生。该结果可为类似软岩大变形隧道施工提供借鉴。

    Abstract:

    In order to solve the problem of large deformation in Muzhailing tunnel caused by soft rock under high ground stress, the numerical simulation was carried out to study the three-bench method. The characteristics of surrounding rock were grasped by analyzing the deformation and stress state of the surrounding rock after excavation. The results show that the main deformation of the surrounding rock has happened before the tunnel face comes and the deformation of tunnel face was large, which might become one of the main reasons lead to the large deformation of surrounding rock. Therefore, the advanced support of the surrounding rock needs to be strengthened during the excavation of tunnel to control the pre-deformation of surrounding rock and the deformation of tunnel face. The results of study can provide a reference for the similar construction of soft rock tunnels with large deformation.

    参考文献
    相似文献
    引证文献
引用本文

肖光书 ,陈党辉 ,郑超 .木寨岭高应力软岩隧道三台阶法数值模拟[J].交通科学与工程,2020,36(4):81-87.
XIAO Guang-shu, CHEN Dang-hui, ZHENG Chao. Study on three-bench method of muzhailing soft rock tunnel under high ground stress by numerical simulation[J]. Journal of Transport Science and Engineering,2020,36(4):81-87.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-06-09
  • 出版日期:
文章二维码