非等桩径荤素桩组合咬合桩受力计算模型研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU753.3

基金项目:

国家自然科学基金资助项目(50908234);湖南省自然科学基金项目(2020JJ4743)


Research on the force calculation model of the bored occluding pile co
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对咬合桩等效成地下连续墙的理论计算模型中的不足,本研究考虑钻孔咬合桩中荤素桩之间桩径相对 大小的影响及素混凝土桩的刚度折减效应,推导出修正后的等效刚度的咬合桩受力与形变理论计算模型。依托深 圳市城市轨道交通 12 号线太子湾站主体围护结构咬合桩工程,采用 Midas/GTS NX 有限元软件建立了数值模拟, 分析了基坑开挖全过程围护结构的受力机理与变形规律,验证理论计算模型。研究结果表明:随着基坑开挖,围 护结构最大水平位移最终收敛于 10 mm 左右。开挖工况下,围护结构的内力与变形增长较快,尤其第三层土开挖 完成后结构内力迅速增长。验证了该理论模型能够有效预测基坑施工过程中钻孔咬合桩的内力与位移发展规律, 可为围护结构的合理设计与安全施工提供理论指导。

    Abstract:

    Aiming at the shortcomings in the current theoretical calculation model of occluding piles equivalent to underground continuous walls, this paper considered the influence of the relative size of the pile diameter between the reinforced concrete piles and the plain concrete piles in the bored occluding piles and the stiffness reduction effect of the plain concrete piles. The corrected equivalent rigidity occluding pile force and deformation theoretical calculation model was derived. At the same time, relying on the occluding pile project of the main enclosure structure of the Taiziwan Station of Shenzhen Urban Rail Transit Line 12, the finite element software (Midas/GTS NX) was used to establish a numerical simulation test to analyze the force mechanism and the deformation law of the enclosure structure during the whole process of excavation of the foundation pit. The deformation law verifies the accuracy of the theoretical calculation model. The analysis results of the theoretical model and the numerical model were combined to point out the structural weaknesses in the bored occluding pile engineering example, and suitable measures were given. The research results show that with the excavation of the foundation pit, the maximum horizontal displacement of the enclosure structure finally converges to about 10 mm. Under the excavation conditions, the internal force and deformation of the enclosure structure increase rapidly, especially after the third layer of soil is excavated. The theoretical model in this paper can effectively predict the internal force and displacement development law of the bored occluding pile during the construction of the foundation pit, and then guide the rational design and safe construction of the enclosure structure.

    参考文献
    相似文献
    引证文献
引用本文

洪源 ,彭正坤 ,任晨灏 ,等.非等桩径荤素桩组合咬合桩受力计算模型研究[J].交通科学与工程,2021,37(1):75-81.
HONG Yuan, PENG Zheng-kun, REN Chen-hao, et al. Research on the force calculation model of the bored occluding pile co[J]. Journal of Transport Science and Engineering,2021,37(1):75-81.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-06-06
  • 出版日期:
文章二维码