Analysis of the influence of shield tunnel construction on the vertical displacement of overlying pipeline
Author:
Affiliation:

Fund Project:

The National Key Research and Development Program of China (No. 2022YFC3800905); The National Natural Science Foundation of China(No. 52078060)

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为研究多因素影响下盾构隧道施工对上覆管线竖向位移的影响。基于Mindlin解与盾构法隧道统一土体移动模型三维解,考虑盾构隧道施工过程中的盾构正面顶推力、盾壳摩阻力、盾尾注浆压力对管线竖向位移的影响,通过参数分析研究了不同地层损失率、管线刚度对管线竖向位移的影响。利用数值模拟与现场实测数据结果进行对比,得到了盾构开挖对上覆管线的竖向位移的变化规律,研究结果表明:盾构正面顶推力、盾尾注浆压力对管线竖向位移影响较小;地层损失与盾壳摩阻力对管线竖向位移影响较大,且盾壳摩阻力是引起管线两端向上微隆起的主要因素;随着地层损失率的增大,管线竖向沉降越显著;管线抗弯刚度越大,竖向沉降越小。

    Abstract:

    In order to study the influence of shield tunnel construction on vertical displacement of overlying pipeline under the influence of multiple factors. Based on the Mindlin solution and the three-dimensional solution of the unified soil movement model of shield tunnel, the effects of shield front thrust, shield shell friction and shield tail grouting pressure on the vertical displacement of the pipeline were considered. The effects of different formation loss rates and pipeline stiffness on the vertical displacement of the pipeline were studied through parameter analysis. By comparing the numerical simulation with the field measured data, the variation law of the vertical displacement of the overlying pipeline is obtained. The research results show that the top thrust of the shield and the grouting pressure of the shield end have little influence on the vertical displacement of the pipeline. Formation loss and shield friction have great influence on vertical displacement of pipeline, and shield friction is the main factor causing upward micro-uplift at both ends of pipeline. With the increase of formation loss rate, the vertical settlement of pipeline becomes more significant. The larger the flexural stiffness of pipeline, the smaller the vertical settlement.